Village and Town of Somers

Street Address
7511 – 12th Street
Kenosha, WI 53144

 

Mailing Address
P.O. Box 197
Somers, WI 53171

 

(262) 859-2822 Tel.
(262) 859-2331 Fax

 

Hours

8:00 am – 4:30 pm

Monday - Friday
 

Map Location

October road closures

 
Following are updated road closures for the month of October and beyond.

  • Highway KR (First St.) will be down to one lane from I-94 to East Frontage Rd. from Monday Oct. 7 for about 2 weeks to replace some concrete.
  • In mid-October, Highway A will close under I-94 for about 3 weeks to complete new roadway.
  • In late October the new eastbound lanes on Highway KR (12th St.) will be paved.
  • On Oct. 7 traffic will shift on I-94 between Highway G to College Ave. in Racine.
  • On Oct. 12 the southbound lanes of I-94 will return to normal side and all ramps will open.  Lanes 2, 3, 4 and the right shoulder southbound will return to its normal traffic pattern. Lane 4 will remain closed to facilitate work on the median wall and sign placement.
  • The last week of October traffic pattern will be alterned on southbound I-94 between Highway 20 to Highway 142 to occomadate new pavement. All ramps except the northbound entrance ramp at  Highway E to I-94 will open. Lanes 2, 3, 4 and the right shoulder southbound will return to normal configuration. Lane 4 will remain closed and northbound will remain as is to facilitate work on the median wall and sign placement.

This is all weather dependent.

I-94 is scheduled to return back to normal from Highway 142 to Highway G in Racine by Dec. 1.
 
Other than landscaping Highway KR between I-94 and Highway H should be complete by Dec. 1.

No new work on Highway KR is scheduled until after July 1, 2020.
 

Share

Legal Notices

 

BIDS and RFP’s

 

Printer Tips

To save paper, use the 'printer-friendly version' link on the top right of each page.