The Somers Village Board of Trustees awarded a $472,000.00 Street Paving Project to Stark Pavement Corp. of Brookfield, Wisconsin by a vote of 7 to 0 at their meeting held on Tuesday, June 28, 2016. The project involves the following:
4th Street
• Pulverize full width, regrade to required 2% slope and replace at the intersection of 38th Avenue finishing at the address of 4600 4th Street.
• Foundation preparation, binder 3”, surface 2”, asphalt driveway, shouldering, 4th Street cross culvert, road stripping.
27th Street
• Pulverize full width of pavement, regrade to required 2% slope and replace starting at the intersection of 30th Avenue finishing at the intersection of 39th Avenue.
• Foundation preparation, grade and pitch ditch lines entire length of project, binder 3”, surface 2”, 27th Street culvert, driveway culverts, parking area culverts, storm drain culvert, road stripping.
• Joint project with City of Kenosha. Costs shared 50-50.
38th Avenue
• Foundation preparation, 4th Street finishing at the end of cul-de-sac dead end, 4th Street intersection milling, heavy tack, surface 2-1/2”, asphalt driveway, shouldering.
47th Avenue
• Pulverize full width of pavement, regrade to required 2% of slope and replace through the intersection of 16th Street and finishing through the intersection of 15th Street.
• Foundation preparation, binder 3”, surface 2”, manhole adjustment, water valve box adjustment, asphalt driveway, shouldering, 47th Avenue cross culvert.
95th Avenue
• Foundation preparation, 13th Street finishing at the end of the cul-de-sac dead end, 13th Street intersection milling, heavy tack, surface 2-1/2”, manhole adjustment, asphalt driveway, shouldering.
Timothy Kitzman, Clerk-Treasurer, publicly opened and read the bids on June 22, 2016 at 10:00 A.M. at the Somers Village/Town Hall. Bids were received from Stark Pavement Corporation of Brookfield, Wisconsin in the amount of $472,000.00 and Payne & Dolan, Inc. of Kenosha, Wisconsin for $584,682.15.